| 000 | 00693nam a2200205 4500 | ||
|---|---|---|---|
| 003 | OSt | ||
| 005 | 20240627025155.0 | ||
| 006 | a | ||
| 008 | 240627b |||||||| |||| 00| 0 eng d | ||
| 020 | _a9789746522212 | ||
| 040 |
_aDWCL-Main lib. _cOC |
||
| 082 |
_2Second edition _aRes. 022.3 W911c 2010 |
||
| 100 | _aWoodwarth, Jeannette | ||
| 245 | _aCountdown to a new library : managing the building project / | ||
| 260 |
_aChicago : _bAmerican Library Association, _cc2010. |
||
| 300 |
_avii, _b272 p. : ill. ; _c28 cm. |
||
| 504 | _aIncludes bibliographical references. & index. | ||
| 650 | _a1. Library buildings-United States-Design and construction. | ||
| 942 |
_2ddc _n0 _cBK-0 CIRC _kRes. |
||
| 999 |
_c1463 _d1463 |
||